Témiscouata 1 St-Honoré-de-Témiscouata

Operational project

Location

St-Honoré-de-Témiscouata, Quebec, Canada

Description

  • Commissioning dateDecember 2014
  • Contract duration20 years
  • Installed capacity23.5 MW
  • 10 Wind turbines

Employée sur le toit d'une éolienne levant les bras

Technical data

  • TurbinesEnercon E92
  • Rotor diameter92 m
  • Platform height85 m
  • Blade size43.8 m

About Boralex

All you need to know about Boralex's activity worldwide.

This way

Technicien souriant

Temiscouata wind farm overview

They are located on public land in Saint-Honoré-de-Témiscouata and are composed of 10 wind turbines. They were commissioned in December 2014.

The Témiscouata wind farms, with a total contracted capacity of 75.2 MW, consist of the 23.5 MW community wind farm (Témiscouata I) and the 51.7 MW Témiscouata II wind power project, commissioned in late 2015.