Skip to main content

Le Plateau 2 MRC d'Avignon en Gaspésie

Operational project

Location

MRC d'Avignon en Gaspésie, Quebec, Canada

Description

  • Commissioning dateDecember 2014
  • Contract duration20 years
  • 21.2 MW Production

  • 9 Wind turbines

Techniciens et techniciennes face à une éolienne

Technical data

  • Turbines9 Enercon E-92
  • Rotor diameter92 m
  • Platform height85 m
  • Blade size43.8 m

About Boralex

All you need to know about Boralex's activity worldwide.

This way

Technicien souriant
technicienne-éolienne

Site overview

The Le Plateau 2 community wind farm is located on unorganized territory of Ruisseau-Ferguson in Avignon MRC, in Québec’s Gaspésie region. It is owned by the Régie intermunicipale de l’énergie Gaspésie-Iles-de-la-Madeleine (40%) and by Boralex (60%).

The farm operates 9 Enercon E‑92 wind turbines and has a 20‑year power supply contract with Hydro-Québec, awarded after a call for tenders, in 2009, to deliver 500 MW of wind power.

The project partners

  • Régie intermunicipale de l’énergie Gaspésie-Iles-de-la-Madeleine : 40 % of parts
  • Boralex : 60 % of parts