Spinning Spur 3 Oldham County

Operational project

Location

Oldham County, Texas, United States

Description

  • Commissioning dateSeptember 2015
  • Installed capacity194 MW
  • 97 Wind turbines

Technicienne souriante sur le toit d'une éolienne levant les mains au ciel

Technical data

  • TurbinesVestas V100/2MW

About Boralex

All you need to know about Boralex's activity worldwide.

This way

Technicien souriant
Spinning Spur 3

Spinning Spur 3 wind farm 
at a glance

Located in Oldham County, TX. Commissioned in 2015 and has a PPA with City of Georgetown / City of Garland expiring in September 2035. This project includes 97 Vestas V100/2MW wind turbines. Boralex owns 50% of this site's interest. The total installed capacity of the site is 194 MW.